Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the ionos-performance domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /mnt/web217/a3/64/510278364/htdocs/Borgel_neu/wp-includes/functions.php on line 6114 Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the updraftplus domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /mnt/web217/a3/64/510278364/htdocs/Borgel_neu/wp-includes/functions.php on line 6114 Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the acf-font-awesome domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /mnt/web217/a3/64/510278364/htdocs/Borgel_neu/wp-includes/functions.php on line 6114 Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the larson-plugin domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /mnt/web217/a3/64/510278364/htdocs/Borgel_neu/wp-includes/functions.php on line 6114 Commencement of Foundation Work for the New Press Brake – Borgel Elementbau

NEWS

Commencement of Foundation Work for the New Press Brake

Commencement of Foundation Work for the New Press Brake

Borgel Umformtechnik GmbH, a renowned subsidiary in the metal processing sector, proudly announces the commencement of foundation work for the installation of a state-of-the-art press brake. This step marks a significant milestone in the expansion of our production capabilities and the strengthening of our market position.

 

The new press brake will be equipped with the latest technologies to enable even more precise processing of metal parts and deliver the highest quality to our customers. The foundation work is a critical part of the installation process, as it lays the groundwork for the machine's performance and safety.

At Borgel Umformtechnik, we are always striving to optimize our processes and increase efficiency. With the new press brake, we will not only expand our manufacturing capabilities but also improve our flexibility and speed in order processing.

The work will be completed soon, after which the assembly of the press brake will begin. We look forward to presenting the benefits of this investment to our customers soon.

For more information about Borgel Umformtechnik and our services, please visit our website at www.borgel-umformtechnik.de

DE
Consent Management Platform by Real Cookie Banner